Resiliency

·

2023

A green seam stitched between neighborhood and storm

A green seam stitched between neighborhood and storm

Anchor Basin Climate Buffer

Fact sheet

Location

Anchor Basin, Boston, MA

Client

Eastport Resilience Initiative / Harbor City Water Authority

Size

6 acres

Year

2023

Status

Built

Services

Resilience Planning, Bioretention Design, Public Realm

Commissioned after repeated king-tide flooding along Anchor Basin, this 6-acre linear park acts as a living buffer for the waterfront. Layered berm planting, permeable paving and bioretention cells absorb 2.5 inches of rainfall in under 90 minutes.

King tides and winter storms had been pushing water across the Anchor Basin waterfront for years, flooding the harbour walk and the streets behind it. The city needed flood protection, and the neighbourhood did not want a wall.

A landform, not a barrier

Our answer was a long, gently rising berm that lifts the protected edge to 12 feet NAVD88 while still reading as a park. A path runs along its crest, giving people new views over the channel, and the slopes are shallow enough to sit on.

Water that has somewhere to go

On the inland side, nine bioretention cells catch rain running off the streets and the berm itself. Each cell is sized for a 100-year storm, and together they absorb 2.5 inches of rainfall in under 90 minutes.

Designed with the neighbourhood

Twelve community workshops shaped the planting palette, the seating and the path alignment. Since opening, a sensor network has tracked soil saturation and runoff after every storm, and the data is shared each year with the city's climate office.

Design team

Marco Reyes, Principal Daria Okafor, Resilience Lead Tom Held, Civil

Collaborators

Ardent Engineering Group (hydrology) Channel Edge Neighbourhood Group

Built by

Atlantic Landscape Contractors

Photography

James Whitfield Studio

Phases

Phases & status

2020

Community Design

Complete

12 workshops held

2020

Community Design

Complete

12 workshops held

2021

Permitting & Engineering

Complete

City and state approvals

2021

Permitting & Engineering

Complete

City and state approvals

2022

Construction

Complete

18-month build

2022

Construction

Complete

18-month build

2023

Post-Occupancy Monitoring

In Progress

Annual flood-event tracking

2023

Post-Occupancy Monitoring

In Progress

Annual flood-event tracking

Comparison

Before & after

Planted Berm System, 2023Exposed Waterfront, 2019Exposed Waterfront, 2019Planted Berm System, 2023
Drag to compare

Time

How it’s growing

Scrub through the stages to see how the site takes hold.

Berm Formation
Berm Formation
Berm Formation
Engineered fill compacted to elevation 12 ft NAVD88
Bioretention
Nine bioretention cells, each sized for 100-year storm event
Planting
Coastal meadow species mix, oyster shell mulch groundcover
Monitoring
Sensor network tracks soil saturation and surface runoff volume
Berm Formation
Berm Formation
Berm Formation
Engineered fill compacted to elevation 12 ft NAVD88
Bioretention
Nine bioretention cells, each sized for 100-year storm event
Planting
Coastal meadow species mix, oyster shell mulch groundcover
Monitoring
Sensor network tracks soil saturation and surface runoff volume

Gallery

Studio

18 Marsh Wharf, Third Floor · New York, NY 10013

Currently

Late summer. Seed heads forming on the Newtown Creek marsh.

© 2026 Understory Landscape Studio

Studio

18 Marsh Wharf, Third Floor · New York, NY 10013

Currently

Late summer. Seed heads forming on the Newtown Creek marsh.

© 2026 Understory Landscape Studio

Create a free website with Framer, the website builder loved by startups, designers and agencies.