Waterfronts

·

2022

Where industry meets the tide, nature reclaims the edge

Where industry meets the tide, nature reclaims the edge

Kiln Creek Tidal Corridor

Fact sheet

Location

Ironbank, Brooklyn, NY

Client

Harbor City Water Authority

Size

14 acres

Year

2022

Status

Built

Services

Site Design, Ecological Restoration, Stormwater Management, Community Engagement

A post-industrial waterfront transformed into a 14-acre tidal wetland corridor connecting Ironbank to the creek's northern arm. The project remediates contaminated shoreline soils while establishing native salt marsh, bioswales, and public promenade.

For more than a century, Kiln Creek was one of the most industrialised waterways on the harbour. Its Ironbank edge was a hard line of steel bulkheads, cracked concrete and chain-link fence, with no way for neighbours to reach the water.

Starting with the ground

Before anything could grow, the ground had to be made safe. Working with the city's water authority and state regulators, we removed contaminated fill along the bank and installed a clean capping layer. We then reshaped the edge into gentle mounds and shallow channels, so the tide could return twice a day and spread across the site.

A marsh that plants itself

More than 40,000 native plugs went in over one growing season, arranged in bands by elevation: cordgrass at the lowest level, salt hay and sea lavender above, and a native upland meadow at the top. Invasive phragmites was removed by hand and kept out through the first three years.

Back to the water

A timber boardwalk now curves through the marsh to a small community pier, the first public access to this stretch of the creek in generations. School groups use it for water sampling, and the creek's first egrets returned the summer after opening.

Design team

Elena Voss, Principal-in-Charge Marco Reyes, Project Lead Suyin Park, Ecology

Collaborators

Ardent Engineering Group Soil & Seed Ecological Consulting

Built by

Poseidon Contracting Greenscape Civil Works

Photography

Irina Mast Photography

Phases

Phases & status

2019

Remediation & Soil Prep

Complete

Phase 1A agency coordination

2019

Remediation & Soil Prep

Complete

Phase 1A agency coordination

2020

Grading & Hydrology

Complete

Tidal connection established

2020

Grading & Hydrology

Complete

Tidal connection established

2021

Planting & Infrastructure

Complete

40,000 native plugs installed

2021

Planting & Infrastructure

Complete

40,000 native plugs installed

2022

Public Opening

Complete

Ribbon cutting, October

2022

Public Opening

Complete

Ribbon cutting, October

Comparison

Before & after

Restored Tidal Marsh, 2022Industrial Shoreline, 2018Industrial Shoreline, 2018Restored Tidal Marsh, 2022
Drag to compare

Time

How it’s growing

Scrub through the stages to see how the site takes hold.

Remediation
Remediation
Remediation
Contaminated fill removed, capping layer installed to regulatory standards
Grading
Microtopography shaped to capture tidal inundation twice daily
Planting
Spartina alterniflora, Phragmites removal, native upland edge seeding
Activation
Boardwalk, interpretive signage, and community pier completed
Remediation
Remediation
Remediation
Contaminated fill removed, capping layer installed to regulatory standards
Grading
Microtopography shaped to capture tidal inundation twice daily
Planting
Spartina alterniflora, Phragmites removal, native upland edge seeding
Activation
Boardwalk, interpretive signage, and community pier completed

Gallery

Studio

18 Marsh Wharf, Third Floor · New York, NY 10013

Currently

Late summer. Seed heads forming on the Newtown Creek marsh.

© 2026 Understory Landscape Studio

Studio

18 Marsh Wharf, Third Floor · New York, NY 10013

Currently

Late summer. Seed heads forming on the Newtown Creek marsh.

© 2026 Understory Landscape Studio

Create a free website with Framer, the website builder loved by startups, designers and agencies.