Water Management

·

2021

A plaza on dry days, a reservoir when the sky opens

A plaza on dry days, a reservoir when the sky opens

Noorderveld Water Squares

Fact sheet

Location

Noorderveld, Rotterdam, Netherlands

Client

Noorderveld District Water Board

Size

2.1 hectares

Year

2021

Status

Built

Services

Cloudburst Design, Public Realm, Hydrology, Community Engagement

Three connected public squares in Rotterdam's Noorderveld kwartier that hold 1.8 million litres of stormwater during cloudbursts and return to basketball courts, terraces and a play basin within a day. Designed with the district as a template other cities can copy.

The Noorderveld kwartier sits below sea level, surrounded by hard surfaces that send heavy rain straight into an overloaded sewer. The block's central yard was a flat asphalt car park that flooded after every cloudburst.

Squares that fill and empty

We sank three connected squares up to 1.2 metres below street level. On dry days they are a basketball court, stepped seating terraces and a shallow play basin. In a cloudburst, they fill one after another and hold up to 1.8 million litres of water, releasing it slowly once the storm has passed.

Water you can see

Polished stainless steel gutters carry rainwater from the surrounding roofs across the plaza in the open, so residents can watch the system work. Blue-grey concrete edges mark the water levels each square is designed to reach.

Built for everyday life

Nine workshops with neighbours shaped what the squares would be used for when dry. Wet-tolerant perennials and 46 trees in structural soil soften the space, and the district now uses the project as a template for water squares elsewhere in the city.

Design team

Elena Voss, Principal-in-Charge Lot Brinkman, Project Lead Tom Held, Water Systems

Collaborators

Polder Studio Tidewater Hydraulics (modelling)

Built by

Groenwerk Aannemers Noordkade Infra

Photography

Merel de Waard

Phases

Phases & status

2017

Cloudburst Modelling

Complete

Catchment mapped street by street

2017

Cloudburst Modelling

Complete

Catchment mapped street by street

2018

Neighbourhood Design

Complete

9 workshops with residents

2018

Neighbourhood Design

Complete

9 workshops with residents

2019

Construction

Complete

Squares built in three phases

2019

Construction

Complete

Squares built in three phases

2021

Storm Performance Review

Complete

Held 1.8 million litres in first year

2021

Storm Performance Review

Complete

Held 1.8 million litres in first year

Comparison

Before & after

Water Square, 2021Asphalt Yard, 2016Asphalt Yard, 2016Water Square, 2021
Drag to compare

Time

How it’s growing

Scrub through the stages to see how the site takes hold.

Excavation
Excavation
Excavation
Squares sunk 1.2 m below street level to create storage volume
Water Routing
Stainless gutters carry roof runoff across the plaza in the open
Planting
Wet-tolerant perennials and 46 trees in structural soil
Handover
Maintenance manual and rainfall dashboard handed to the district
Excavation
Excavation
Excavation
Squares sunk 1.2 m below street level to create storage volume
Water Routing
Stainless gutters carry roof runoff across the plaza in the open
Planting
Wet-tolerant perennials and 46 trees in structural soil
Handover
Maintenance manual and rainfall dashboard handed to the district

Gallery

Studio

18 Marsh Wharf, Third Floor · New York, NY 10013

Currently

Late summer. Seed heads forming on the Newtown Creek marsh.

© 2026 Understory Landscape Studio

Studio

18 Marsh Wharf, Third Floor · New York, NY 10013

Currently

Late summer. Seed heads forming on the Newtown Creek marsh.

© 2026 Understory Landscape Studio

Create a free website with Framer, the website builder loved by startups, designers and agencies.